Main Page | Condo Renovation
16058
portfolio_page-template-default,single,single-portfolio_page,postid-16058,ajax_fade,page_not_loaded,,qode_grid_1200,footer_responsive_adv,qode-content-sidebar-responsive,transparent_content,qode-theme-ver-17.0,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.5.5,vc_responsive

Condo Renovation

Sterling, VA

About This Project

This condominium had two bedrooms, two full baths, living room, dining room, kitchen, and a laundry room. What stands out in this condo were that there was a myriad of decorative trim elements in the main living rooms. The work required painting of walls, doors, and trim; replacement of all the door hardware and light fixtures. It took three weeks to complete.

Date
Category
General Contracting, Painting, Renovation, Repair
No Comments

Post A Comment